News

[Dubai, UAE - 5 October 2026] RigQuip announces successful management buyout by Managing Director

Learn more
Case Study

Semi-sub Reactivation​

RigQuip was engaged by the managers of a modern, 6th gen ultra deepwater semi-submersible to carry out inspection and service of its entire HMH (MH Wirth) drilling package as part of its rig reactivation following a long period of stacking. Our team deployed at short notice to deliver this scope working on less common equipment in a remote location prior to the rig joining its new drilling contract. ​
  • Asset:

    Semisub

  • Location:

    Curacao

  • Duration:

    60 days

Hoisting & Rotating
Top Drive
Drawworks
Mud Pumps
Crown Assembly
Travelling Block​
Deadline Anchor​
Rotary Table
Access baskets & winches

Pipe Handling Equipment
Pipe Racking System
Fingerboards
Pipe Conveyor
Iron Roughnecks
BX Elevators
Power Slips​
Stand Building Crane​
Hydraulic Catheads​
Handling Tools ​​

Power & Control​
Drilling Control System​
Power System

[case_study_features]

To learn more about this project, schedule a call with our team Contact us