Drillship reactivation

Inspection and maintenance of NOV pipe handling equipment,​ mud systems and ancillary equipment​ Inspection and maintenance of NOV pipe handling, ancillary equipment​ Inspection and maintenance
  • Asset:

    Drillship

  • Location:

    Norway

  • Duration:

    90 days

Pipe Handling​

Top Drive Pipe Handlers​
Knuckleboom Crane​​
Fingerboards​​
Pipe Handling Catwalk ​​
Riser Handling Catwalk​​
Wireline Riser Tensioners​​
Hydraulic Catheads​
Power Slips​

Mud System

Mud Pumps​
Shakers​
Centrifuges​
Mud Mixing System​ & Tanks​
Pumps, Agitators​ & Desilter​s​
​Mud Gas Separator​s​
Vacuum Degassers​​
Mud System & Other Valves​​
Bulk Transfer System​​
Cement/Barite System ​​

Ancillary Equipment

BOP Gantry Crane​​
BOP Trolley & Test Stump​​
Xmas Bridge Crane & Trolley​​
Hose Reel Stations​ & Winches​​
Hydraulic Pressure Units​